
RTP end fittings are where a reinforced thermoplastic pipe either ties cleanly into steel — or becomes the leak point that the spoolable line was meant to avoid. This guide is for operators, EPC teams and procurement engineers who already shortlisted RTP for a gathering, water or injection route and now need to choose, qualify and RFQ the steel end fittings for RTP pipe that close the system.
It is an end-fitting product and qualification guide, not another “what is RTP” page. Definitions belong in RTP Pipe for Oilfield Service: What Reinforced Thermoplastic Pipe Is and How to Spec It. When RTP fits gathering service belongs in the selection guide linked later. Pipe-body liner, reinforcement and jacket choices belong in the specifications guide. Here the job is narrower: lock the termination type, qualify pipe and fitting as one system, and put comparable fields into the RFQ.
Why end fittings decide RTP system pressure and leak risk
A long spool can reduce the number of field joints — but each termination, repair or intermediate connection remains a critical interface. The live RTP product page states that end fittings and couplings are part of the pressure-containing system: their materials, sealing mechanism, attachment method and qualification belong in the same technical package as the pipe. Treating the pipe body as “qualified” while the RTP end fitting is still a catalogue afterthought is how systems fail the first hydrotest or the first steel tie-in.
Pressure capability of an RTP string is never the pipe headline alone. Product capability depends on the exact liner, reinforcement, cover, end fittings, size and qualification. “RTP” does not by itself prove a pressure, temperature, chemical-compatibility or API rating. That is why this post stays on terminations — and why the money CTA for the pipe family is Reinforced Thermoplastic Pipe (RTP) once, with end-fitting scope declared beside it.
What CNPS lists: steel end fittings, flanged or hubbed, for tying into steel systems
The CNPS catalogue page CNPS Reinforced Thermoplastic Pipe for Demanding Fluids is the only place that publishes an explicit end-fitting product line for RTP. The stated language is short and specific: Steel End Fittings for RTP Pipe — flanged or hubbed terminations to tie into existing steel systems.
That is the product scope for this guide. It does not invent a fitting taxonomy beyond flanged or hubbed steel end fittings. It does not publish sizes, pressure classes, material grades, seal types or bolt patterns for the fitting — those stay RFQ-declared. Catalogue notes that spoolable reels cut joint count and that pre-fabricated terminations further speed tie-ins are useful planning language; they are not a substitute for a size-specific datasheet or a qualified termination procedure.
CNPS supplies API 15S certified RTP. That statement names the pipe family the end fitting must match. It does not invent a certificate number, monogram detail or end-fitting scope limit. Buyers may request certificate copies with the quotation.
Flanged vs hubbed terminations: where each fits

Both options in the catalogue are steel terminations for tying into existing steel systems. Which one fits a given station is buyer-declared from the interface you already have — not from a blog preference:
- Flanged terminations — when the mating side is a steel flange on a valve, manifold, pig launcher, pump nozzle or skid. Declare the steel drilling pattern, face type, gasket and bolting with the RFQ; none of those are published as a fixed CNPS end-fitting table.
- Hubbed terminations — when the station expects a hub-style steel interface rather than a bolted flange face. Declare the hub standard and mating hardware the same way you would declare a flange interface.
Typical places these show up on an RTP pipeline route: lease tie-ins, manifold headers, pig launcher or receiver interfaces, and temporary hydrotest blinds that later become permanent steel transitions. The duty is yours to tag on the isometric — the catalogue only states flanged or hubbed steel end fittings for steel-system tie-in.
Qualify pipe + fitting as one system

API 15S language for spoolable reinforced plastic line pipe is about manufacture and qualification of the product — and end fittings sit inside that buyer conversation. How to read what the spec covers, what a certificate proves, and how to ask for it in an RFQ is owned by API 15S RTP: What the Spec Covers, What a Certificate Proves, and How to Ask for It in an RFQ. This post does not rewrite that standard guide.

What to lock before comparing offers:
| Qualification field | What you declare | Why it stays with the offer |
|---|---|---|
| Pipe + fitting package | Same size, pressure-temperature basis and medium for both | Live PDP states end fittings are part of the pressure-containing system |
| Standard / edition | API 15S edition (or other declared project requirement) | Not every RTP product is automatically qualified; evidence is configuration-specific |
| Termination type | Flanged or hubbed (catalogue scope) | Only CNPS-stated end-fitting types for RTP |
| Steel interface | Drilling / hub standard, face, gasket, bolting — buyer-declared | Not published as a CNPS end-fitting ratings table |
| Documents | Datasheet, make-up / termination procedure, test basis, certificate copies if required | RFQ may request copies; no numbers or monograms invented here |
Pipe-body construction (liner, reinforcement, jacket) stays with RTP Pipe Specifications: Liner, Reinforcement and Jacket Choices Against Pressure, Temperature and Medium — one sentence here: the fitting limits the system the same way the size-specific pipe rating does, so do not qualify them on separate sheets.
Mid-line connectors and repairs: questions to ask
Catalogue scope for this post is end terminations — flanged or hubbed steel end fittings. Mid-line connectors, field repairs and intermediate couplings are not published as a CNPS RTP end-fitting product line on the pages scraped for this guide. Ask them as questions, not as assumed SKUs:
- Does the offer include a qualified mid-line or repair connector for this size and pressure-temperature basis, or only end terminations?
- Is any repair method factory-qualified, field-qualified, or both — and which documents travel with the spool?
- Who supplies tooling, dies or fixtures if a field termination or repair is part of the installation plan?
- How are repair locations tagged into the as-built and hydrotest dossier?
Do not treat swaged, crimped or electrofusion language as a CNPS product claim. If a vendor proposes a method, put the method name, size, test basis and procedure on the RFQ as vendor-declared scope.
Field installation and pressure test of terminations
Reel logistics and trained installation are part of the same system as the fitting. Plan minimum bend radius, pull forces, terrain and termination work before the reel leaves the yard. Ask for, and keep with the offer:
- the written termination / make-up procedure for the offered flanged or hubbed fitting;
- hold points for assembly, inspection and NDE if your project requires them;
- pressure-test procedure for the completed termination (shop and/or field), including acceptance criteria language — not invented pressures;
- traceability from reel / pipe heat or batch to each installed end fitting;
- storage and handling notes for seal faces and hub/flange protection before bolt-up.
This guide does not publish torque values, seal compounds or test pressures. If a quotation arrives without a termination procedure and a test plan for the fitting, treat that as an incomplete offer.
RTP end-fitting RFQ fields

When RTP already fits the service, use RTP Pipe Selection: When Reinforced Thermoplastic Pipe Fits Gathering Service (RFQ Fields) for the pipe-selection frame — then add these termination fields on the same sheet rather than repeating that full selection RFQ:
| RFQ field | What to write |
|---|---|
| Tag / station | P&ID or isometric tag for each termination |
| Pipe identity | Size, liner / reinforcement / jacket basis from the pipe offer; link the same datasheet |
| Termination type | Flanged or hubbed steel end fitting (catalogue scope) |
| Steel interface | Drilling or hub standard, face, gasket, bolting — buyer-declared |
| Design P / T / medium | Same envelope as the pipe qualification — do not invent fitting-only ratings |
| Qty and spare policy | Number of ends, blinds/test fittings if needed, spares |
| Installation | Shop vs field make-up; tooling responsibility; crew training |
| Documents | Datasheet, termination procedure, test basis, API 15S evidence / certificate copies if required |
API 17J unbonded flexible pipe has its own end-fitting scope — see API 17J Flexible Pipe: When Unbonded Flexible Pipe Fits Offshore Flowlines (Selection & RFQ Fields). This RTP guide does not claim CNPS 17J end fittings. When the sheet is filled in, send it through Talk to an Engineer so the offer is built against your tags, not a generic “RTP fittings” headline.
FAQ
What are RTP end fittings in this guide?
Steel end fittings — flanged or hubbed terminations — that close an RTP string into an existing steel system. The guide covers product scope, system qualification and RFQ fields. It is not a fitting-types encyclopedia and not a pipe-selection rewrite.
Flanged or hubbed — how do I choose?
Match the steel interface you already have or will install: flange face and bolt pattern for flanged ends; hub standard and mating hardware for hubbed ends. Both are listed on the CNPS RTP catalogue as steel terminations for steel-system tie-in. Declare the interface in the RFQ; do not invent ASME class numbers here.
Do API 15S end fittings need separate qualification from the pipe?
Treat pipe and fitting as one pressure-containing system. Ask for configuration-specific evidence, edition and scope language with the quotation. Buyers may request certificate copies. This post does not invent monogram details or scope limits.
Where are sizes and pressure ratings for the end fitting?
Not published as a CNPS end-fitting ratings table on the scraped catalogue or PDP pages. Put size, design pressure, temperature and medium on the RFQ beside the pipe datasheet, and ask for the size-specific termination datasheet.
Does CNPS list mid-line connectors or repair kits for RTP?
Not as a stated end-fitting product line on the pages used for this guide. Ask mid-line and repair scope as RFQ questions. Do not assume swaged, crimped or electrofusion methods are CNPS catalogue items.
How do API 17J end fittings relate to this post?
One boundary only: 17J pipe has its own end-fitting scope. Use the API 17J selection guide linked above. This post makes no CNPS claim for 17J end fittings.
What is the fastest next step?
Confirm flanged vs hubbed against your steel interface, fill the RFQ table with pipe and fitting on one sheet, use the www RTP product page as the single product CTA, and send the package through Talk to an Engineer.


